LIST OF WORK PACKAGES
            
            
                
                    | WP Number | WP Title | 
            
            
                
                
                    | WP 1 | Management and coordination | 
                
                
                    | WP 2 | Sites and field tests | 
                
                
                    | WP 3 | MMV technologies and real-time reporting and visualization | 
                
                
                    | WP 4 | Modeling | 
                
                
                    | WP 5 | Strategies for storage management | 
                
                
                    | WP 6 | Leakage detection and mitigation | 
                
                
                    | WP 7 | Risk assessment: procedures, protocols for certification and licensing | 
                
                
                    | WP 8 | Communication, public engagement and liabilities | 
                
                
                    | WP 9 | Training and capacity building | 
                
                
                    | WP 10 | Extrapolation | 
            
            
                
                    |  |  | 
            
        
        
     
    
     
    
    
        Work Package 1: Management and coordination
        Description:
        
            Project management deals with all activities (administrative and scientific alike) needed for a smooth execution
of the project within the specified time frame. The underlying strategy for this task has been presented in
the section dealing with project management. Here we shall detail the practical steps to be taken in order to
implement the suggested management strategy. 
        
        Objectives:
        
            - Establish the management structure.
- Conduct the overall management of the project execution.
- Review, audit and quality of the deliverables.
- Communication and reporting to the EU authorities.
- Communication with the Board of associated parties (BAP).
- Prepare yearly progress reports.
- Ensure, harmonize and coordinate all consortium activities.
- Review and evaluate milestones.
- Ensure communication and dataflow between partners.
- Deal with possible problems.
- Supervise the execution of the dissemination work.
- Preparing the basis for technological deployment and a plan for the exploitation of results.
 
        
    
    
        Work Package 2: Sites and Field tests
        Description:
        
            TRUST is associated with a number of sites: 
            1) Heletz (Israel) where the field activities within TRUST will focus;
            2) Hontomin (Spain), where the experiments are decided and carried outside TRUST; 
            3) The Swedish/Baltic sites
               (Sweden), where feasibility studies are presently being carried out;
 
            4) Miranga (Brazil). 
        
        Objectives:
        
            - Prepare the Heletz site for the CO2 injection experiments to be conducted in TRUST;
- Gather data and information on the Hontomin experiments;
- Gather data and information on the Miranga CO2 injection sites;
- Exchange of information and contribute to the design of injection experiments in the Swedish/Baltic sites.
  
   
    
    
        Work Package 3: MMV technologies and real-time reporting and visualization
        Description:
        
            The effort in this work-package is devoted to:
            
                - The implementation at Heletz (Israel)
            of a coordinated set of surface and downhole MMV technologies, such as online single
            hole resistivity and fiber optical temperature sensors, passive and active near-surface
            seismic monitoring, pressure tomography, and reactive tracers studies.
- integration
            of measurements and monitoring results as part of an internet platform for online
            visualization of results, in 1D, 2D and 3D (variation along axis, 1-D and 2-D time
            series, contour maps) with periodic reports and alert threshold definitions.
Objectives:
        
            - Design and implement safe, cost effective and multi-purpose monitoring technologies
            enabling to verify the storage stability and to produce reliable and high resolution
            datasets for model validation. 
            
- Field test of a new single-hole, integrated, monitoring
            device based on the preliminary work conducted as part of the MUSTANG and PANACEA
            FP7 projects. 
            
- Design and implement a new integrated active and passive seismic
            monitoring system. 
            
- Develop the (Kinetic Interface Sensitive) KIS tracer based
            on the preliminary work conducted during the MUSTANG project. 
            
- Determine of permeability
            changes as a proxy for the extent of the CO2 plume.
            
- 
            Integrate surface and downhole measurements and monitoring results in an internet platform with online visualization tools.
        
  
   
    
    
        Work Package 4: Modeling
        Description:
        
            The effort in this work-package is devoted to:
            
                - Experiments planning simulations and validation of the simulation models against
                    experimental field data: The injection experiments (WP02, WP05) at Heletz (and Hontomin)
                    will provide unique data for model validation, to demonstrate the models’ ability
                    to capture the key process of CO2 spreading and trapping under different modes of
                    operation.
- Modeling methodology and modeling of the long term and industrial scale behavior:
                    This task deals with modeling activities, also related to the experimental sequences.
Objectives:
        
            - 
            Model and modeling approach development, evaluation and validation against comprehensive
            sets of field data.
- 
            Development of approaches for long-term and large scale (industrial) predictions
            of CO2 injection and storage.
        Secondery objectives:
        
            - Design simulations of injection experiments, including testing of different injection
                scenarios.
- Interpretation and model matching of the injection experiments.
- Development of the operational models for the sites for large-scale and long-time
                predictions.
- Providing a field data case for model cross-validation and providing a first approach
                for such cross-validation.
  
   
    
    
        Work Package 5: Strategies for storage management
        Description:
        
            The issues that need to be considered for optimal storage management are:
 
            
                - Optimal modes of CO2 injection;
- Optimal ways of pressure control, including possible brine disposal;
- Optimal use of the resources (mainly energy and drilling costs).
 When analyzing the performance of a storage operation, the entire chain of components
                needs to jointly considered, including:
 
                     i) handling of the CO2 at the outlet of the supply line (pressure and temperature, phase); 
                     ii) conditioning of the CO2 at the well head; 
                     iii) behavior of the CO2 in the injection pipe; 
                     iv) the conditions of the CO2 at the well bottom and obviously 
                     v) the conditions and influences in 
                the reservoir. 
                In this WP different modes of injection will be tested in the field,
                additional ones analyzed by models and by laboratory experiments. Based on the results,
                conclusions forming basis for industrial extrapolation will be made.
        
        Objectives:
        
            The overall objective of this WP is to define optimal injection strategies
            and modes of injection, to 
                 (i) maximize the trapping while:
                 (ii) minimizing the reservoir pressure build-up and... 
                 (iii) minimizing the energy usage and other major costs of
            the operation.
            This is achieved through the following secondary objectives: 
        
        
            - Plan and implement injection strategies, firstly for the experiments to be carried
                out within the frame of this project (WP2). This includes: 
 
                         (i) testing of different modes of injection, 
 (ii) evaluating the trade-offs of injecting dissolved CO2,
 (iii) assessing the effectiveness of different injection geometries and
 (iv) envisaging testing injection of CO2 micro-bubbles in brine.
 
- Extend the analyses, by means
                of modeling, to other conditions and site characteristics. 
- Analyze results and
                suggest recommendations on best practices for injection, from the outlet of the
                supply line to the reservoir and the related pressure management.
  
   
    
    
        Work Package 6: Leakage detection and mitigation
        Description:
        
            The purpose of this work-package is to demonstrate leakage monitoring and leakage mitigation operations in
            real time conditions.
            The first phase of the work consists in testing the sealing potential of different types of fluids (ionic solutions, light
            slurries and sol-gels) in porous media and fractured media. Optimal sealing is examined in terms of carbonation
            potential, volume increase during the reaction and irreversibility by means of laboratory experiments. To this
            end, new equipment developed by CNRS will be used. This percolation bench allows reproducing storage
            conditions in large size cores while measuring the permeability drop due the reactive fluid injection. Post mortem
            analyses of the cores using 3D tomographic images and electronic microscopy techniques will be used to
            investigate the sealing mechanisms and to assist the optimization of the fluid formulation (composition, retardant
            products, rheology, …) and injection protocol (flow rate, alternative use of different fluids, temperature, volume,
            …) according to the local hydro-thermo-chemical properties of the Heletz reservoir. The changes of geophysical
            properties (acoustic and electric) will be measured for the purpose of determining the possibility of monitoring the
            extent of the sealing at field scale and detect eventual degradation.
        
        Objectives:
        
            - develop a new technology for remediation based on reactive fluid injection (self-carbonation solute).
- Determine the optimal fluid formulations and uses according to the local hydro-thermo-chemical properties of
            the reservoir.
- Conduct a controlled experiment of CO2 leakage in a poorly plugged or unplugged well at Heletz site.
- Monitor the start of the leaking and its development with time.
- Perform the remediation fluid injection.
- Demonstrate that it is an operational technology for the mitigating of leaky wells.
  
   
    
    
        Work Package 7: Risk Assessment: Procedures, Protocols for Certification and Licensing
        Description:
        
            Risk management covers in general the complete risk assessment cycle: risk identification, analysis, evaluation,
            and treatment, controlling, monitoring, reviewing, identifying and handling residual risks and ensuring
            communication and exchange of information. These, universally applicable, principles and generic guidelines on
            risk management have been defined since 2009 in ISO 31000 and the related documents The challenge is here
            to adapt these general tools to the specific needs of risk management to the CO2 storage demands in TRUST.
        
        Objectives:
        
            - Develop and implement a site specific risk management procedure Heletz site, aimed at achieving a
            comprehensive risk assessment process, controlling and monitoring, communication of information, handling
            and minimizing residual risks (especially downhole, near the wellbore, and within the caprock) and detecting and
            handling possible failures of the seal or near-well completion.
- Compare the risk management tools applied for Heletz site with the approaches and findings in Hontomin.
- Use the risk management findings as input for further applications such as the development of guidelines,
            protocols for site licensing and certification, liability issues.
  
   
    
    
        Work Package 8: Communication, public engagement and liabilities
        Description:
        
            
                - TRUST website design and implementation and social media.
- Systematic review of current and past CCS projects to apply lessons learned 
                    to TRUST sites.
- Public outreach.
- Lessons learned for social and regulatory purposes.
- Investigation of the liabilities problem for site certification and licensing.
Objectives:
        
            - Ensure broad visibility of TRUST, by establishing a solid platform for sharing knowledge within the consortium
            as well as for reaching the widest audience possible, by means of modern IT technologies and social networks;
- Address issues of communication, social acceptance and liability in order to enable the project partners to fulfill
            their communication efforts and stakeholder involvement tasks.
- Delineate a preliminary framework for the liability issues in relation to the site certification and licensing.
  
   
    
    
        Work Package 9: Training and capacity building
        Description:
        
            
                - Establish facilities for the technical training and demonstration at the Heletz site and 
                facilitate educational visits.
- Organize formal educational courses for the international forum.
- Affiliate PhD students, Post-Doctoral scientists and Masters students to the R&D work.
- Active dissemination to the scientific/technical community
Objectives:
        The overall objective of this work package is to promote education, training and capacity building in the field of
        geological storage of CO2. This is implemented through the following:
        
            - Construct in at least one of sites (the Heletz site) facilities for the technical training and demonstration;
- Promote education and competence building by organizing formal educational courses for the international
            forum and related to this, develop course material for teaching;
- Promote education and competence building by affiliating of PhD students, Post-Doctoral scientists and Maters
            students to the R&D work of TRUST;
- Actively disseminate to the scientific/technical community (industries, regulators) via the end-users group (BAP)
            of the project.
  
   
    
    
        Work Package 10: Extrapolation
        Description:
        Identification of typical settings of industrial scale applications and
        relating these characteristics to the scales analyzed in the present field studies. This involves:
        
            - Analysis of existing industrial sites where data is available (operating history, geometry, parameter
            characteristics, short- and long-term dynamics of hydraulic, transport and mechanical responses) as well as
            other sites where large-scale site characteristics can be derived, as well as:
- Defining the industrial scale dimensions of the sites analyzed in detail in WP02 and WP05.
Objectives:
            
                The overall objective of this WP is to extrapolate the results of the project to the industrial scale application as
                well as to develop generic approaches for such upscaling. This is achieved by means of the following subsidiary
                objectives:
            
        
            - Identification of typical settings and characteristics of industrial scale operations;
- Upscaling of the model simulations and the results of the field injection experiments to industrial scale;
- Upscaling of the monitoring strategies and network design for large scale;
- Preparation of protocols for site management;
- Formulation of best practices and recommendations and exploitation of results.